    Home Casess Cases 500TPH Primary Crushing Plant & Secondary Crushing and Screening Plant for Iron Ore Mining in Mexico

    500TPH Primary Crushing Plant & Secondary Crushing and Screening Plant for Iron Ore Mining in Mexico

    2026-03-31

    Project Background

    Hierro del Norte SA de CV, a Mexican iron ore mining company operating a large open-pit iron ore mine in Durango State, required a complete crushing and screening plant upgrade to increase ore processing capacity from 350TPH to 500TPH and improve product size consistency for the downstream pelletising circuit. The company's VP of Operations, Mr. Miguel Angel Torres, began evaluating equipment suppliers in early 2023. A business associate who had visited a mining industry conference recommended Xianglong Machinery, and Torres subsequently found XLM on Alibaba International Station, where the company's Gold Supplier profile and detailed product listings provided confidence in XLM's manufacturing capability. He also found XLM's LinkedIn company page and followed it before submitting a formal inquiry.

    Channel Communication and Needs Assessment

    XLM's Latin America sales manager, Mr. Kevin Liu, responded to the Alibaba inquiry within 24 hours and established ongoing communication via WhatsApp and email. Mr. Torres described the project requirements: a complete two-stage crushing and screening system -- a Primary Crushing Plant and a Secondary Crushing and Screening Plant -- capable of processing 500TPH of iron ore from a maximum feed size of 1,000 mm (ROM ore) to a final product of minus 12 mm for the pelletising circuit. The iron ore had a Bond Work Index of approximately 10-12 kWh/t and a Mohs hardness of 5-6.

    Technical Solution and Engineering Alignment

    XLM's senior application engineer, Mr. David Chen, designed a two-stage crushing system. The Primary Crushing Plant was configured with a PE-1500x1800 Jaw Crusher as the primary unit, with a ZSW-600x150 Vibrating Feeder with grizzly screen to bypass fines and protect the jaw from overloading. The Secondary Crushing and Screening Plant used an HP500 Multi-cylinder Hydraulic Cone Crusher in closed circuit with a 3YK2460 Circular Vibrating Screen, achieving the target minus 12 mm product. Both plants were designed as semi-mobile, skid-mounted units to allow future relocation as the mine pit developed.

    Technical discussions proceeded over six weeks via WhatsApp video calls and email. David provided detailed equipment specifications, a plant layout drawing for the Durango site, foundation load calculations, and a comprehensive commissioning and operator training plan. Critical seismic adaptations were engineered for Mexico's high-risk seismic zone (Durango is in Seismic Zone D per Mexican CFE standards): both the Primary and Secondary Crushing Plants were designed as semi-mobile skid-mounted units with reinforced structural steel frames capable of 8-degree seismic fortification, equipment anchor bolts were specified with seismic-rated shear strength, and the plant layout incorporated seismic separation joints between major equipment modules to prevent collision damage during earthquake events. The modular steel structure design also enables future relocation via crane lifting as the mine pit develops. Spanish-language operation and maintenance manuals were provided for all equipment. The contract was signed in April 2023, with a delivery period of 100 days for the complete two-plant system. XLM also provided an extended warranty and a 12-month spare-parts package.

    Delivery, Installation, and Commissioning

    All equipment was shipped from Qingdao to Manzanillo port and transported by road to the Durango mine site. XLM dispatched a commissioning team of three engineers -- Mr. David Chen (lead), Mr. Zhang Wei (mechanical), and Mr. Li Fang (electrical) -- to Mexico for a 25-day on-site installation and commissioning programme. Working alongside Hierro del Norte's technical crew, the XLM team completed mechanical assembly, electrical integration, and trial production within the planned timeframe. The combined crushing system achieved 515TPH at minus 12 mm during the final acceptance test, 3% above the guaranteed capacity.

    500TPH Primary Crushing Plant & Secondary Crushing and Screening Plant for Iron Ore Mining in Mexico


     

    500TPH Primary Crushing Plant & Secondary Crushing and Screening Plant for Iron Ore Mining in Mexico


     

    500TPH Primary Crushing Plant & Secondary Crushing and Screening Plant for Iron Ore Mining in Mexico


    Results and Client Feedback

    Within two months of full commercial operation, Hierro del Norte confirmed that the new crushing system was delivering consistent minus 12 mm product to the pelletising circuit, enabling the pellet plant to increase its production rate by 38% compared to the previous crushing system's output. The improved product size consistency also reduced pellet plant energy consumption per tonne of pellets produced. By month four, the project had met its internal ROI target, with the additional pellet production revenue more than covering the equipment investment and commissioning costs.

    Mr. Miguel Angel Torres stated: "This has been the most successful capital investment our company has made in the past decade. XLM's engineering team's expertise in iron ore crushing applications, their meticulous project management, and their outstanding on-site commissioning support have set a new benchmark for equipment supplier performance. We are planning a further expansion of our Durango operation and have already engaged XLM in preliminary discussions about supplying ball mills and classification equipment for the expanded grinding circuit. Xianglong Machinery is our trusted long-term partner for mining equipment."

    Share:

    250 TPH Three-Combination Mobile Station — Granite Aggregate, South Africa

    60TPH XL Spiral Sand Washer & BX Fine Sand Recovery Machine for Construction Sand in Colombia

    Related Article

    image
    Colombian aggregate plant retrofitted XLM spiral sand washer and fine sand recovery system. Boosted saleable sand yield by 18%. 60 t/h construction-grade washed sand. Payback in 9 months.
    60 TPH Spiral Sand Washer + Fine-Sand Recovery — Construction Sand, Colombia
    2026-05-26
    image
    Ethiopian aggregate producer deployed XLM jaw+cone+washing circuit for 300 t/h river gravel. 85% water recovery closed-loop system. Seasonal river, water-scarcity compliant. Concrete-grade sand output.
    300 TPH Jaw + Cone + Washing Circuit — River Gravel, Ethiopia
    2026-05-26
    image
    Brazilian limestone quarry deployed XLM tracked impact crusher for 350 t/h production. Engineered for monsoon-season operation with sealed electrics and reinforced drainage. Single-machine brownfield solution.
    350 TPH Track-mounted Impact Crusher — Limestone Quarry, Brazil
    2026-05-26
    image
    South African contractor deployed XLM three-combination mobile crushing station for 250 t/h granite aggregate. Set up in 5 days, 180-220 MPa hard rock. Highway road construction spec.
    250 TPH Three-Combination Mobile Station — Granite Aggregate, South Africa
    2026-05-22

    Tel: +86 13253634888
    E-mail: info@xlmac.com
    Whatsapp: +86 13253634888

    Engineers Online

    Products

    PE Jaw Crusher

    PF Impact Crusher

    HP Cone Crusher

    VSI Sand Making Machine

    Track-mounted Primary Crusher

    Raymond Mill

    Business

    Aggregate

    Mining Industry

    Industrial Minerals

    Construction

    Blog

    crusher

    SiteMap
    Subscribe
    (509895)
    Email
    info@xlmac.com
    Phone
    +8613253634888
    WhatsApp
    +8613253634888
    Inquiry
    Inquiry
    Top